Cockpit Energy Industrial EV Tech Legal & M&A Project Delivery
National Clean Energy Asset Registry · Decision 500/QĐ-TTg · Decision 262/QĐ-TTg

Vietnam PDP8 Clean Energy Registry & Statutory Asset Pipeline

National clean energy telemetry tracking 960 utility facilities against Decision 500/QĐ-TTg statutory mandates.

960 Facilities Active
Clean Baseload
80,612 MW

53.6% of PDP8 Mandate Active

2030 Target Mandate
150,489 MW

Decision 500/QĐ-TTg Horizon

Pipeline Delta Gap
+69,877 MW

Mandated 2026-2030 COD

Tracked Facilities
960 Assets

Geocoded across 63 Provinces

Transmission Grid
65,566 km

1,915 Substations (500/220kV)

Statutory Capex
$134.7B

$119.8B Gen + $14.9B Grid

Decree 80 DPPA
2,000+ MW

Private Wire & Grid Wheeling

Wind & Solar Quota
48,478 MW

27.9 GW Wind + 20.6 GW Solar

DECISION 500/QĐ-TTg · RESOLUTION 55-NQ/TW · NET-ZERO 2050 PATHWAY

The 14 Strategic Pillars of Vietnam's National Energy Transition

Statutory capacity targets, capex allocation, and execution milestones through 2030.

Pillar 01 · Generation $18.5B Est. Capex

Offshore Wind Supergrid

Target 2030: 6,000 MW
2050 Vision: 70,000 - 91,500 MW
Statutory: Decision 500/QĐ-TTg, Marine Spatial Plan
Pillar 02 · Generation $26.2B Est. Capex

Onshore & Nearshore Wind Corridors

Target 2030: 21,880 MW
Current COD: 4,798 MW (21.9%)
Statutory: Decision 500/QĐ-TTg Table 1
Pillar 03 · Generation $14.1B Est. Capex

Utility & Rooftop Solar PV

Target 2030: 12,836 MW + RTS
Operating Capacity: 16,500+ MW
Statutory: Decree 135/2024/NĐ-CP (Self-Consumption)
Pillar 04 · Generation $11.8B Est. Capex

Flexible Hydro, Pumped Storage & BESS

Hydro Baseload: 29,346 MW
Pumped + BESS: 2,700 MW by 2030
Statutory: Decision 500/QĐ-TTg, Pumped Storage Roadmap
Pillar 05 · Generation $31.4B Est. Capex

Domestic Gas & Transition LNG Terminals

Domestic Gas Target: 14,930 MW
Import LNG Target: 22,400 MW
Statutory: National LNG Terminal Master Plan
Pillar 06 · Generation $3.6B Est. Capex

Biomass, Waste-to-Energy & Cogen

Target 2030: 2,270 MW
2050 Potential: 6,015 MW
Statutory: Circular Economy & Waste Management Directives
Pillar 07 · Supergrid $14.9B Est. Capex

500kV Supergrid Backbone Spine

Circuit Extent: 15,888 km (180 Circuits)
Wheeling Capacity: Up to 5,000 MW Northward
Statutory: National Key Infrastructure Project (Circuit-3 COD 2024)
Pillar 08 · Supergrid $4.2B Est. Capex

Cross-Border ASEAN Grid Interties

Lao Import Quota: 5,000 - 8,000 MW
Subsea Export Vision: 1,200 MW to Singapore
Statutory: Vietnam-Laos Energy Cooperation Agreement
Pillar 09 · Supergrid $3.8B Est. Capex

Smart Grid Automation & Digital SCADA

Digital Substations: 100% Unmanned by 2030
DSM Flexibility: 2,000 MW Shaving
Statutory: Prime Minister Decision 1670/QĐ-TTg (Smart Grid)
Pillar 10 · Market Reform Private Wheeling

Direct Power Purchase Agreement (DPPA)

Mechanisms: Direct Wire & Grid-Connected
Eligibility: ≥ 200,000 kWh/month
Statutory: Decree 80/2024/NĐ-CP (Enacted July 3, 2024)
Pillar 11 · Market Reform Spot Clearing

Competitive Power Market (VWEM / VREM)

Market Design: SMP + Capacity (CAN)
Retail Choice (VREM): Target Full Rollout 2026+
Statutory: Amended Electricity Law 2024, ERAV Circulars
Pillar 12 · Net-Zero Tech $6.2B Est. Capex

Green Hydrogen, Ammonia & Power-to-X

Target 2030: 100k - 500k tons/year
2050 Scale: 10 - 20 Million tons/yr
Statutory: Decision 165/QĐ-TTg (Hydrogen Strategy)
Pillar 13 · Carbon Market $4.5B Carbon Value

National Carbon Market & Article 6 ETS

ETS Launch: Pilot 2025 · Full 2028
Covered Emitters: 1,912 Industrial Sites
Statutory: Decree 06/2022/NĐ-CP · Decision 13/2024/QĐ-TTg
Pillar 14 · Grid Baseload $8.0B Basal Capex

Industrial DSM & Nuclear SMR Readiness

DSM Peak Shaving: 1,500 MW Target
SMR Exploration: Post-2035 Horizon
Statutory: Decision 280/QĐ-TTg · Resolution 55-NQ/TW
Decision 500/QĐ-TTg · Decision 262/QĐ-TTg · PDP8 Statutory Transition Matrix

Statutory Power Generation Sector Mix & 2030 Transition Targets

Authoritative statutory fuel transition breakdown comparing Vietnam's active operational baseload against required pipeline capacity through 2030. Click any sector row or GIS action to filter corresponding spatial assets and dossier records in the cockpit below.

2030 Mandate: 150,489 MW
Operating: 80,612 MW (53.6%)
Generation Sector / Fuel Operating (MW) 2030 Mandate (MW) Pipeline Delta (MW) Transition Progress (Active / Target) 2030 Share Statutory Policy Status & Scope GIS Action
Hydropower Thủy điện
19,101 MW 29,346 MW +10,245 MW
65% active +35% pipeline
19.5% Expansion of major dams (Ialy, Tri An, Hoa Binh) + small hydro run-of-river
Onshore Wind Điện gió trên bờ & gần bờ
4,603 MW 21,880 MW +17,277 MW
21% active +79% pipeline
14.5% Heavy deployment in Central Highlands, South Central Coast & Mekong Delta
Offshore Wind Điện gió ngoài khơi
0 MW 6,000 MW +6,000 MW
0% active +100% pipeline
4.0% Pioneering pilot concessions (Thang Long, La Gan, Ca Mau) awaiting marine spatial licenses
Solar Power Điện mặt trời (Tập trung & Mái nhà)
11,467 MW 15,436 MW +3,969 MW
74% active +26% pipeline
10.3% 12,836 MW utility-scale + 2,600 MW self-consumption under Decree 135/2024/ND-CP
Biomass & Waste Sinh khối & Điện rác
620 MW 2,270 MW +1,650 MW
27% active +73% pipeline
1.5% Wood pellets, bagasse, and municipal solid waste-to-energy facilities
Domestic Gas & LNG Nhiệt điện Khí & LNG
7,200 MW 37,330 MW +30,130 MW
19% active +81% pipeline
24.8% 14,930 MW domestic gas (Block B, Ca Voi Xanh) + 22,400 MW imported LNG fleet
Grid Storage & Pumped Hydro Thủy điện tích năng & Pin lưu trữ (BESS)
0 MW 2,700 MW +2,700 MW
0% active +100% pipeline
1.8% Bac Ai 1,200 MW pumped storage + pilot utility BESS frequency regulation systems
Coal Thermal (Capped) Nhiệt điện than (Đạt đỉnh & Khống chế)
26,000 MW 30,127 MW +4,127 MW
86% active +14% pipeline
20.0% Strict cap under JETP; no new coal-fired plants approved after 2030
Power Imports Nhập khẩu điện
1,621 MW 5,400 MW +3,779 MW
30% active +70% pipeline
3.6% Cross-border transmission lines from southern Laos and China
National System Totals 80,612 MW 150,489 MW +69,877 MW
54% System Active +46% System Pipe
100.0% Decision 500/QĐ-TTg & Decision 262/QĐ-TTg National Power Master Plan Mandate

Provincial Capacity Intelligence & Asset Lifecycle Analytics

Interactive multi-fuel generation analytics across 960+ assets. Click any province bar or status slice to filter the table below.

Interactive Cross-Filter Enabled
Top 10 Energy Provinces (MW Capacity) Click bar → Filter Table
Commercial Status Click → Filter
Operational Baselines PDP8 Quota Target
Decision 500/QĐ-TTg · 500kV Supergrid Backbone · Inter-Regional Wheeling Flow

National Electrical Transmission Spine & Clean Energy Power Flow

Live geospatial topology visualizing North-South power wheeling corridors between Central/Southern renewable hubs and Northern load centers across 65,566 km of AC circuits and 1,915 substations.

500kV Flow: 15,888 km (180 Circuits)
220kV Grid: 27,007 km (780 Circuits)
Transmission Corridor Flow
500kV North-South Spine
220kV Intertie Regional Corridors
Operational Generation Plants (960)
Model: NSMO Vietnam 2025 65,566 km Circuits

Node Telemetry Dossier

National Overview
DYNAMIC ENERGY BALANCE MODEL · PRIMARY GENERATION TO INDUSTRIAL SINK

National Energy Transition Flow & Power Balance Trajectory

Simulated end-to-end power flow tracing primary energy supply transformation, transmission wheeling through the 500kV/220kV supergrid, and sectoral consumption sinks across Vietnam's phased decarbonization roadmap.

Annual Generation
280.5 TWh
+8.2% YoY growth
Peak Demand (Pmax)
48,500 MW
National High: May 2024
Renewable Share
43.2%
Hydro 29% + Solar/Wind 14%
Grid Carbon Intensity
0.68 tCO2/MWh
Target ≤ 0.42 by 2030
Stage 1 · Primary Generation 84,000 MW Installed
Hydropower (Run-of-River & Reservoir) 23,500 MW (28.0%)
Coal Thermal (Phasing Down) 26,800 MW (31.9%)
Domestic Gas & Transition LNG 7,200 MW (8.6%)
Solar PV (Utility + Rooftop RTS) 16,500 MW (19.6%)
Wind Corridors (Onshore/Offshore) 4,800 MW (5.7%)
Storage BESS, Imports & Biomass 5,200 MW (6.2%)
Stage 2 · Supergrid & Wheeling 65,566 km Circuits
500kV Supergrid Spine Wheeling: ~3,200 MW Peak (Central → North)

Transmitting renewable energy from Southern/Central surplus regions to industrial manufacturing clusters in Northern Vietnam.

220kV Regional Interties: 27,007 km (780 Circuits)

Regional inter-provincial pooling substations collecting utility solar, wind, and cascade hydropower.

Transmission Losses & Reserve: 6.25% Grid Loss

Technical loss optimized down from 7.5% through Circuit-3 500kV operation and automated VAR compensation.

Direct Wheeling Protocol: High-voltage substations dynamically route green energy under Decree 80/2024 DPPA to subscribed industrial off-takers.
Stage 3 · Sectoral Demand Sinks 100% Demand
Industrial Parks & Clean Manufacturing 54.2% (~152 TWh)
High-tech semiconductors, steel, electronics & RE100 manufacturing
Residential & Commercial Buildings 35.8% (~100 TWh)
Urban municipal loads, HVAC cooling, urban lighting & commercial towers
Electric Mobility & EV Charging Corridors 6.5% (~18 TWh)
Fast-growing EV fleet (VinFast & public transport) across 22,055+ charging ports
Green Hydrogen, Ammonia & Export 3.5% (~10 TWh)
Power-to-Gas electrolysis, green steel, and maritime shipping fuels
NATIONAL DISPATCH AUTHORITY · VWEM WHOLESALE CLEARING · DECREE 80 DPPA

National Energy Situation & Wholesale Market Intelligence Terminal

Real-time national dispatch balance telemetry, regional grid reserve margins, Vietnam Wholesale Electricity Market (VWEM) spot clearing rates, and Decree 80/2024 DPPA tariff schedules.

VWEM Spot Market: Active
System Balance & Operational Reserve Dispatch Cycle: Real-Time
National Peak Demand vs Capacity 57.7% System Loading
Current Peak Load:
48,500 MW
Total Installed Capacity:
84,000 MW
Regional Grid Reserve Margins
Northern Grid
12.4% Reserve
Summer Peak Dependent
Central Grid
46.8% Reserve
Clean Energy Surplus
Southern Grid
28.5% Reserve
Industrial Baseload
500kV Northward Wheeling
3,200 MW Continuous
Central/South → North
Cascade Hydro Storage
78.5% Reservoir Cap
Sơn La & Hòa Bình Dam
System Security Note: National Load Dispatch Centre (NLDC / NSMO) coordinates dynamic AGC and secondary reserves across all 500kV interties to ensure grid frequency stability at 50.0 ± 0.2 Hz.
Wholesale Market Clearing & Tariff Structure VWEM Spot Reference
System Marginal (SMP)
1,640 VND
$0.066 / kWh
Capacity Payment (CAN)
185 VND
$0.0075 / kWh
Full Market (FMP)
1,825 VND
$0.073 / kWh
Decree 80/2024/NĐ-CP DPPA Wheeling Fee Total: ~280.0 VND/kWh ($0.011)
Transmission Fee: 79.5 VND/kWh
Distribution Fee: 165.2 VND/kWh
Dispatch Ancillary: 35.3 VND/kWh
Industrial Retail Electricity TOU Tiers (MoIT) Decision 2699/QĐ-BCT
Off-Peak (22:00-04:00) 1,100 VND $0.044/kWh
Normal Hours 1,685 VND $0.068/kWh
Peak (09:30-11:30, 17-20) 3,171 VND $0.128/kWh
Investment Brief: Under Decree 80 DPPA, clean generators sell at spot VWEM prices while contracting virtual Contracts-for-Difference (CfD) with corporate buyers, de-risking capital investments.
Fuel:
Facility Name Developer / Sponsor Type Capacity Province Action
Showing 1 to 25 of 960 assets
1 / 39